Tuesday, October 7, 2008

Full-ride Scholarships Nyu

New track New track Vigonovese

. New cycle path
Street Vigonovese

Opening Saturday, October 11, 2008 cycling lane street Vigonovese

The track, which is the first phase of street Vigonovese, is an important step that helps to connect the neighborhoods to center and to restore the dignity Camin of village steeped in history.

The route provides the connection path from the bridge of San Gregorio to the border with the City of Vigonovo, through the center of Camino. Since you can not find a seat reserved for continuous and secure way Vigonovese cyclists along the route there will be a number of additional works necessary to improve the overall condition of safe passage for bicycles. Were used as functional systems:
  • pedestrian paths on both sides of the road raised to the level of the asphalt pavement;
  • bike lanes on both sides of the street in red, at the entrance, separated from the flow from a simple road markings and vertically.
The project is the result of a series of public meetings organized by the Council of District 3 East with residents and traders Camin. Opening


The bicycle path was opened Saturday, October 11, 2008, at 11:45, at Villa Berta, via Vigonovese, 141.

are present:
  • - Flavio Zanon, mayor of Padua
  • - Ivo Rossi, Councillor mobility
  • - Andrea Micallef, chairman of the District 3 East
For
office cycling
Palace Sarpi, Fra Paolo Sarpi street, 2 (IV piano) - Padova telefono 049 8204883 orario: martedì e giovedì dalle 10:30 alle 13:00 e-mail ufficio.biciclette@comune.padova.it
.
http://www.padovanet.it/dettaglio.jsp?id=11728
.
PS. del blogger - anche questo nuovo tratto di ciclabile si presenta come variante dell'anello ciclo-fluviale di Padova soprattutto nel tratto E.
.

0 comments:

Post a Comment